Supreme Court: Solar Power Generating Systems Are Not Works Contracts, and the 70:30 GST Ratio Was Only Optional Before 1 January 2019

In Sterling and Wilson Pvt. Ltd. v. Union of India, 2026 INSC 1222, the Supreme Court set aside a GST demand of about ₹53.36 crore (CGST, SGST and penalties) for supply and installation of Solar Power Generating (SPG) systems between 01.07.2017 and 31.12.2018. The Court held that these supplies attracted the concessional 5% rate under Serial No. 234 as a whole system; that the 70:30 goods-services split, introduced only from 01.01.2019, was offered for the earlier period merely as an option by Circular No. 163/19/2021-GST; and that an SPG system fixed on a civil foundation is not immovable property, so the contract is not a ‘works contract’. Extended limitation under Section 74 was also held wholly unsustainable.

Key Takeaways

  • For 01.07.2017 to 31.12.2018, supply and installation of an SPG system was taxable at 5% (2.5% CGST + 2.5% SGST) under Serial No. 234 of Notification No. 1/2017-CT (Rate).
  • The 70:30 deemed valuation (Notification No. 24/2018-CT (Rate)) applies only from 01.01.2019 and is not retrospective.
  • Circular No. 163/19/2021-GST says tax ‘can’ be paid at 70:30 for the earlier period – an option for assessees, not a mandate for officers.
  • Every composite supply is not a works contract; a works contract under Section 2(119) needs immovable property as the end product.
  • Solar panels fixed on a civil foundation for stability, and detachable for use elsewhere, are not immovable property.
  • Section 74 cannot be invoked to allege suppression for not applying a regime that did not then exist.
  • Availability of an appellate remedy is not a straitjacket; the High Court should not have dismissed a writ raising arguable points in a cursory manner.

Case Details at a Glance

Case titleM/s. Sterling and Wilson Pvt. Ltd. v. Union of India and others
Citation2026 INSC 1222 (Reportable)
Case numberCivil Appeal arising out of SLP (C) No. 23844 of 2025
BenchJustice Sanjay Kumar and Justice Sanjeev Sachdeva
Authored byJustice Sanjay Kumar
Date of judgment16 November 2026
Period involved01.07.2017 to 31.12.2018
ProvisionsSections 2(30), 2(119), 9, 74, 122 and 168, CGST Act, 2017; Schedule II, Para 6
Impugned ordersOrder dated 17.01.2025 of Joint Commissioner, CGST & CX, Thane and Summary Order dated 24.01.2025; Bombay High Court order dated 28.07.2025 in W.P. No. 4616 of 2025
DemandCGST ₹13,33,95,241 + penalty, with equal SGST – total ₹53,35,80,964
ResultAppeal allowed; demand orders set aside

Background

Sterling and Wilson sets up solar power generating systems on a turnkey EPC basis across India. For the period 01.07.2017 to 31.12.2018, it paid GST at 5% treating the supply as an SPG system under Serial No. 234 of Schedule I to Notification No. 1/2017-CT (Rate), a concession recommended by the GST Council to keep renewable power affordable.

On 31.12.2018, two notifications took effect from 01.01.2019: Notification No. 24/2018-CT (Rate) deemed 70% of the gross consideration as goods (5%) and 30% as services (18%), giving an effective rate of about 8.9%; and Notification No. 27/2018 inserted the matching services entry. In 2021, Circular No. 163/19/2021-GST clarified that taxpayers ‘can’ pay at the 70:30 ratio for the earlier period as well, without refunds where more had been paid.

The department read the circular as a mandate. A show cause notice dated 29.03.2023 invoked Section 74, and the Joint Commissioner, Thane, on 17.01.2025, held the supplies to be works contracts involving immovable property, applied 70:30, alleged wilful suppression and imposed penalties. The Bombay High Court dismissed the writ petition on 28.07.2025 for want of exhausting the appellate remedy.

Alternate Remedy Is Not a Straitjacket

The Supreme Court first held that the High Court’s cursory dismissal was unjustified. It had noticed only one of the two orders under challenge, and the petition raised arguable points. The rule of exhausting alternate remedies is not a straitjacketed formula. Ordinarily the Court would remit the matter, but since it was fully argued and already decided by the Andhra Pradesh High Court, the Supreme Court decided it on merits.

Supreme Court’s Ruling on Merits

1. The 70:30 ratio was an option, not a mandate

The amending notifications came into force on 01.01.2019 with no retrospective effect. The 2021 circular, issued under Section 168, responded to requests from assessees who wanted to use 70:30 for the earlier period. Its use of ‘can’ gave the choice to assessees.

“There was no mandate, either in the Notification or in the Circular, that the 70:30 ratio had to be compulsorily applied...” – Supreme Court, 2026 INSC 1222, para 33

2. No suppression, no extended limitation

Since the 70:30 regime did not exist before 01.01.2019, there could be no fraud, wilful misstatement or suppression in not applying it. Citing Tata Steel Ltd. v. Union of India, the Court reiterated that the foundational facts for such allegations must appear in the notice; using the words is not enough.

3. Not a works contract: SPG systems are not immovable property

Under Section 2(119), a works contract must relate to immovable property. Every composite supply under Section 2(30) is not a works contract. Applying Solid and Correct Engineering Works, Sirpur Paper Mills, Duncans Industries and Bharti Airtel, the Court held that the panels are fixed to a foundation only for stability and can be detached and used elsewhere. The foundation exists for the system’s benefit, not the other way round. The inclusion of some civil work in the EPC contract did not change this.

The Court approved the consistent view of the Andhra Pradesh High Court – in Sterling and Wilson’s own case (10.01.2025), not challenged by the Revenue; in Siemens Gamesa on wind turbine generators (SLP dismissed); and in Arka Green Power on solar pumping systems. Reliance on a Madhya Pradesh High Court tender case was misplaced.

4. Later amendment cannot be applied backwards

Notification No. 8/2021-CT (Rate) replaced ‘solar power generating system’ with ‘solar power generator’ in a new Serial No. 201A. This shows that earlier the entire system was taxed as one unit; the change cannot be applied retrospectively.

The demand orders of 17.01.2025 and 24.01.2025 were set aside.

Impact on Solar EPC Contractors

PeriodGST position after this judgment
01.07.2017 – 31.12.20185% on the whole SPG system under Serial No. 234; 70:30 split only if the assessee opts for it
From 01.01.201970% deemed goods at 5% and 30% deemed services at 18% under the Explanation to Serial No. 234 (later Serial No. 201A)

Solar and renewable energy contractors facing pre-2019 demands based on Circular No. 163/19/2021-GST now have binding authority that the circular cannot be enforced against them. The ruling on movable property also strengthens the position that solar plants and similar equipment bolted to foundations are goods, not works contracts – though the Court stressed that each case turns on its facts.

  • Review pending show cause notices and orders for the 2017–18 period that apply 70:30 or invoke Section 74.
  • Assessees who already paid more under 70:30 should note the circular’s no-refund condition; take advice before claiming.
  • Where a demand raises arguable legal points, a writ petition may be maintainable despite the appellate remedy.

Frequently Asked Questions

What was the GST rate on solar power generating systems before 1 January 2019?

5% (2.5% CGST plus 2.5% SGST) on the whole system under Serial No. 234 of Notification No. 1/2017-CT (Rate), as confirmed in 2026 INSC 1222.

Is the 70:30 ratio mandatory for solar EPC contracts before 2019?

No. The Supreme Court held that Circular No. 163/19/2021-GST only gave assessees an option to use the 70:30 ratio for the earlier period.

Is a solar EPC contract a works contract under GST?

Not merely because it includes civil work. A works contract requires immovable property as the end product, and SPG systems fixed on foundations for stability and detachable are not immovable property.

Can Section 74 extended limitation be invoked for solar supplies before 2019?

No. Since the 70:30 regime did not exist then, there could be no suppression or wilful misstatement in not applying it.

Must a GST demand always be challenged in appeal with pre-deposit?

Not always. The Court held that the alternate remedy rule is not a straitjacket and a writ raising arguable points should be examined.

This article is for general information only and does not constitute legal advice. Readers should refer to the certified copy of the judgment and consult a qualified professional before acting. See our Editorial Policy and Disclaimer.